We carry out detail engineering of process plant, utilities and offsites and have executed many projects, which are in operation. The services are provided for recovery units, battery limit process plants and grass root facilities. We have well experienced team of engineers, associates, and draftsmen to provide detail engineering services for process, fabricated equipment, rotating equipment, electrical, instrument and piping.

Our services are -

Industries We Cater To

oil-industry
Refinery
lab-tool
Chemical
nano-technology
Polymer
oil-platform
Oil And Gas
industry
Speciality Chemicals And Pharma
petrochemical
Petrochemical

SUMMARY OF PROJECTS BY RUMARA

Sr. No.ActivityPast ProjectsType of ProjectDuration of Project
1Piping and Instrumentation Diagram (P&ID): Consistency check between Drafted and Master P&IDs1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit)
2. Complete Basic and Detailed Engineering of Methanol Recovery System
3. Complete Basic and Detailed Engineering of Butyl Ether
4. FEED Verification for Crude Oil and Associated System
5. FEED Engineering for LNG and LPG System
6. P&ID checking
7. Detailed Engineering of Ammonia and Castor Oil System
8. Steam and Condensate system of Boiler
9. Drum Filling System of Iso-Butyl Alcohol and n-Butyl Alcohol
10. Review and comments on Furnace system of FCCU Unit
1. LSTK Project
2. Basic and Detailed Engineering
3. Basic and Detailed Engineering
4. FEED Level
5. FEED Level
6. Detailed Engineering Activity
7. Detailed Engineering
8. Detailed Engineering Activity
9. Detailed Engineering Activity
10. Detailed Engineering Activity
1. 6 months and Ongoing
2. 3 month
3. 5 months
4. 3 months
5. 2 month and Ongoing
6. 1 month
7. 6 months
8. 1 month
9. 2 months
10. 1 week
2Consistency check between P&ID and Isometrics1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit)
2. Utility Pump Hydraulic Calculations
1. LSTK Project
2. Detailed Engineering Activity
1. 6 months and Ongoing
2. 2 months
3Line Hydraulic Calculation (Single phase/ Two Phase) with Isometric Drawings1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit) (400 lines)
2. Complete Basic and Detailed Engineering of Methanol Recovery System (200 lines)
3. Complete Basic and Detailed Engineering of Butyl Ether (300 lines)
4. Detailed Engineering of Ammonia and Castor Oil System (100 lines)
5. FEED Verification for Crude Oil and Associated System (150 lines)
6. Utility Network Model (Cooling Water, Brine, Chilled Water and Waste Water) using AFT Fathom
7. FEED Engineering for LNG and LPG System
1. LSTK Project
2. Basic and Detailed Engineering
3. Basic and Detailed Engineering
4. Detailed Engineering
5. FEED Level
6. Detailed Engineering Activity
7. FEED Level
1. 6 months and Ongoing
2. 3 months
3. 5 months
4. 6 months
5. 3 months
6. 3 months
7. 2 month and Ongoing
4Pump hydraulics Calculation1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit)
2. Complete Basic and Detailed Engineering of Methanol Recovery System
3. Complete Basic and Detailed Engineering of Butyl Ether
4. Detailed Engineering of Ammonia and Castor Oil System
5. FEED Verification for Crude Oil and Associated System
6. Utility Pump Hydraulic Calculations
7. FEED Engineering for LNG and LPG System
1. LSTK Project
2. Basic and Detailed Engineering
3. Basic and Detailed Engineering
4. Detailed Engineering
5. FEED Level
6. Detailed Engineering Activity
7. FEED Level
1. 6 months and Ongoing
2. 3 months
3. 5 months
4. 6 months
5. 3 months
6. 2 months
7. 2 month and Ongoing
5Control valve sizing1. FEED Verification for Crude Oil and Associated System
2. Utility Pump Hydraulic Calculations
3. Complete Basic and Detailed Engineering of Butyl Ether
4. FEED Engineering for LNG and LPG System
1. FEED Level
2. Detailed Engineering Activity
3. Basic and Detailed Engineering
4. FEED Level
1. 3 months
2. 2 months
3. 5 months
4. 2 months and Ongoing
6Heat Exchanger Thermal Calculation (Data entry)1. Complete Basic and Detailed Engineering of Methanol Recovery System
2. Complete Basic and Detailed Engineering of Butyl Ether
3. FEED Engineering for LNG and LPG System
1. Basic and Detailed Engineering
2. Basic and Detailed Engineering
3. FEED Level
1. 3 months
2. 5 months
3. 2 months and Ongoing
7PSV Sizing Calculation1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit)
2. FEED Verification for Crude Oil and Associated System
3. Complete Basic and Detailed Engineering of Methanol Recovery System
4. Complete Basic and Detailed Engineering of Butyl Ether
5. FEED Engineering for LNG and LPG System
1. LSTK Project
2. FEED Level
3. Basic and Detailed Engineering
4. Basic and Detailed Engineering
5. FEED Level
1. 6 months and Ongoing
2. 3 months
3. 3 months
4. 5 months
5. 2 month and Ongoing
8Vessel Sizing1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit)
2. FEED Verification for Crude Oil and Associated System
3. Complete Basic and Detailed Engineering of Methanol Recovery System
4. Complete Basic and Detailed Engineering of Butyl Ether
5. FEED Engineering for LNG and LPG System
6. Vessel Datasheet Preparation and Updation for Isomer Process Unit
1. LSTK Project
2. FEED Level
3. Basic and Detailed Engineering
4. Basic and Detailed Engineering
5. FEED Level
6. Detailed Engineering Activity
1. 6 months and Ongoing
2. 3 months
3. 3 months
4. 5 months
5. 2 month and Ongoing
6. 1 month
9Tank Sizing1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit)
2. Complete Basic and Detailed Engineering of Methanol Recovery System
3. Complete Basic and Detailed Engineering of Butyl Ether
4. FEED Verification for Crude Oil and Associated System
1. LSTK Project
2. Basic and Detailed Engineering
3. Basic and Detailed Engineering
4. FEED Level
1. 6 months and Ongoing
2. 3 months
3. 5 months
4. 3 months
11Surge AnalysisSurge analysis for Cooling water network for Glass lined exchangers ( by leased based AFT Impulse)Special Studies3 months
10AFT Fathom Network Hydraulic (Steady State)Utility Network Model (Cooling Water, Brine, Chilled Water and Waste Water) using AFT FathomSpecial Studies3 months
11Instrument datasheet Preparation1. Instrument Datasheet Preparation for Crude Dewaxing Unit
2. Complete Basic and Detailed Engineering of Methanol Recovery System
3. Complete Basic and Detailed Engineering of Butyl Ether
4. Detailed Engineering of Ammonia and Castor Oil System
5. FEED Verification for Crude Oil and Associated System
1. Detailed Engineering Activity
2. Basic and Detailed Engineering
3. Basic and Detailed Engineering
4. Detailed Engineering
5. FEED Level
1. 1 month
2. 3 months
3. 5 months
4. 6 months
5. 3 months
12Line list1. Complete Basic and Detailed Engineering of Methanol Recovery System
2. Complete Basic and Detailed Engineering of Butyl Ether
3. FEED Verification for Crude Oil and Associated System
4. FEED Engineering for LNG and LPG System
1. Basic and Detailed Engineering
2. Basic and Detailed Engineering
3. FEED Level
4. FEED Level
1. 3 months
2. 5 months
3. 3 months
4. 2 months and Ongoing
13Equipment list1. Complete Basic and Detailed Engineering of Methanol Recovery System
2. Complete Basic and Detailed Engineering of Butyl Ether
3. FEED Verification for Crude Oil and Associated System
4. FEED Engineering for LNG and LPG System
1. Basic and Detailed Engineering
2. Basic and Detailed Engineering
3. FEED Level
4. FEED Level
1. 3 months
2. 5 months
3. 3 months
4. 3 months and Ongoing
14Hazardous Area Classification1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit)
2. FEED Engineering for LNG and LPG System
1. LSTK Project
2. FEED Level
1. 6 months and Ongoing
2. 3 months and Ongoing
15Operating ManualFEED Engineering for LNG and LPG SystemFEED Level3 months and Ongoing
16HAZOP Study and Closeout1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit) - Participation and Closeout of Recommmendation
2. Chairing of HAZOP Study for Bio-Gas System
1. LSTK Project
2. Special Studies
1. 6 months and Ongoing
2. 1 Week
17SIL Study1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit)
2. SIL Assessment (SIF Identification and Hand Switches)
1. LSTK Project
2. Special Studies
1. 6 months and Ongoing
2. 1 month
18Safety Study
1.Emergency Isolation Valve Study
2. IPL Assessment
3. LO/LC Assessment
Multiple International Sites of our reputed clientSpecial Studies3 months to 8 months