Corporate Profile
We Make Your Vision A Reality.
About Rumara Engineering
RUMARA is an emerging engineering and project services organization. We provide complete engineering services for oil and gas, petrochemical, Refinery, Chemical and Pharmaceuticals projects.
Our aim is to provide Design Engineering services/ consultancy to EPC contractors, Detail Engineering organizations and operating companies at various stages of project execution.
We specialize in delivering solutions that enable customers with less in-house engineering capabilities or resources, to execute challenging projects.
Our core objective is to provide process design engineering consultation/solutions to the clients who are -
- Willing to give projects to fulfill their in-house engineering capabilities and / or resources to execute the challenging projects
- Willing to offload project work during multiple project assignments scenario
- Want to optimize / avoid expenses of the staff-based employments especially during a competitive market.
We undertake services on man-hour, day rate or lump-sum basis as per the client’s requirements. Engineering services can be provided to client office, any third-party office, project site or in our design office as per the client’s requirements.
To provide responsive, safe and trusted solution to clients with the highest quality and cost- effective engineering and design services in the industry while maintaining ethical standards
- Secured IT Infrastructure
- In house validated sizing / calculation programs
- In-house company procedure / checklist assures consistency in deliverables
- No compromise on quality and schedule
- Continuous project monitoring
- Quality check procedure
- Flexibility, speed and accuracy
- Work from home capability
- Process engineering design and drafting team (inhouse)
- Engineering Management (Inhouse)
- Process Safety Analysis
Inhouse technical expertise in process engineering are being developed internally.
In Addition, we have associate companies to support Mechanical, Piping, HSE and Water Treatment disciplines where we form a Project based consortium.
Why Choose Us?
We are one of the best process design engineering consultant in mumbai. Feel Free to contact us anytime you want via email or direct phone call. We will be happy to help you.

Quality Engineering

Global Experience Team

Cost Effective Solutions

Employee Development

Strong Client Relations

Flexible Working Style

We Value Employee Contribution

ISO 9001:2015 Certified

All Size Projects
Let have a cup of tea with rumara Engineering
We can make your vision come true!
Rumara Office

















SUMMARY OF PROJECTS BY RUMARA
Sr. No. | Activity | Past Projects | Type of Project | Duration of Project |
---|---|---|---|---|
1 | Piping and Instrumentation Diagram (P&ID): Consistency check between Drafted and Master P&IDs | 1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit) 2. Complete Basic and Detailed Engineering of Methanol Recovery System 3. Complete Basic and Detailed Engineering of Butyl Ether 4. FEED Verification for Crude Oil and Associated System 5. FEED Engineering for LNG and LPG System 6. P&ID checking 7. Detailed Engineering of Ammonia and Castor Oil System 8. Steam and Condensate system of Boiler 9. Drum Filling System of Iso-Butyl Alcohol and n-Butyl Alcohol 10. Review and comments on Furnace system of FCCU Unit | 1. LSTK Project 2. Basic and Detailed Engineering 3. Basic and Detailed Engineering 4. FEED Level 5. FEED Level 6. Detailed Engineering Activity 7. Detailed Engineering 8. Detailed Engineering Activity 9. Detailed Engineering Activity 10. Detailed Engineering Activity | 1. 6 months and Ongoing 2. 3 month 3. 5 months 4. 3 months 5. 2 month and Ongoing 6. 1 month 7. 6 months 8. 1 month 9. 2 months 10. 1 week |
2 | Consistency check between P&ID and Isometrics | 1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit) 2. Utility Pump Hydraulic Calculations | 1. LSTK Project 2. Detailed Engineering Activity | 1. 6 months and Ongoing 2. 2 months |
3 | Line Hydraulic Calculation (Single phase/ Two Phase) with Isometric Drawings | 1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit) (400 lines) 2. Complete Basic and Detailed Engineering of Methanol Recovery System (200 lines) 3. Complete Basic and Detailed Engineering of Butyl Ether (300 lines) 4. Detailed Engineering of Ammonia and Castor Oil System (100 lines) 5. FEED Verification for Crude Oil and Associated System (150 lines) 6. Utility Network Model (Cooling Water, Brine, Chilled Water and Waste Water) using AFT Fathom 7. FEED Engineering for LNG and LPG System | 1. LSTK Project 2. Basic and Detailed Engineering 3. Basic and Detailed Engineering 4. Detailed Engineering 5. FEED Level 6. Detailed Engineering Activity 7. FEED Level | 1. 6 months and Ongoing 2. 3 months 3. 5 months 4. 6 months 5. 3 months 6. 3 months 7. 2 month and Ongoing |
4 | Pump hydraulics Calculation | 1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit) 2. Complete Basic and Detailed Engineering of Methanol Recovery System 3. Complete Basic and Detailed Engineering of Butyl Ether 4. Detailed Engineering of Ammonia and Castor Oil System 5. FEED Verification for Crude Oil and Associated System 6. Utility Pump Hydraulic Calculations 7. FEED Engineering for LNG and LPG System | 1. LSTK Project 2. Basic and Detailed Engineering 3. Basic and Detailed Engineering 4. Detailed Engineering 5. FEED Level 6. Detailed Engineering Activity 7. FEED Level | 1. 6 months and Ongoing 2. 3 months 3. 5 months 4. 6 months 5. 3 months 6. 2 months 7. 2 month and Ongoing |
5 | Control valve sizing | 1. FEED Verification for Crude Oil and Associated System 2. Utility Pump Hydraulic Calculations 3. Complete Basic and Detailed Engineering of Butyl Ether 4. FEED Engineering for LNG and LPG System | 1. FEED Level 2. Detailed Engineering Activity 3. Basic and Detailed Engineering 4. FEED Level | 1. 3 months 2. 2 months 3. 5 months 4. 2 months and Ongoing |
6 | Heat Exchanger Thermal Calculation (Data entry) | 1. Complete Basic and Detailed Engineering of Methanol Recovery System 2. Complete Basic and Detailed Engineering of Butyl Ether 3. FEED Engineering for LNG and LPG System | 1. Basic and Detailed Engineering 2. Basic and Detailed Engineering 3. FEED Level | 1. 3 months 2. 5 months 3. 2 months and Ongoing |
7 | PSV Sizing Calculation | 1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit) 2. FEED Verification for Crude Oil and Associated System 3. Complete Basic and Detailed Engineering of Methanol Recovery System 4. Complete Basic and Detailed Engineering of Butyl Ether 5. FEED Engineering for LNG and LPG System | 1. LSTK Project 2. FEED Level 3. Basic and Detailed Engineering 4. Basic and Detailed Engineering 5. FEED Level | 1. 6 months and Ongoing 2. 3 months 3. 3 months 4. 5 months 5. 2 month and Ongoing |
8 | Vessel Sizing | 1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit) 2. FEED Verification for Crude Oil and Associated System 3. Complete Basic and Detailed Engineering of Methanol Recovery System 4. Complete Basic and Detailed Engineering of Butyl Ether 5. FEED Engineering for LNG and LPG System 6. Vessel Datasheet Preparation and Updation for Isomer Process Unit | 1. LSTK Project 2. FEED Level 3. Basic and Detailed Engineering 4. Basic and Detailed Engineering 5. FEED Level 6. Detailed Engineering Activity | 1. 6 months and Ongoing 2. 3 months 3. 3 months 4. 5 months 5. 2 month and Ongoing 6. 1 month |
9 | Tank Sizing | 1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit) 2. Complete Basic and Detailed Engineering of Methanol Recovery System 3. Complete Basic and Detailed Engineering of Butyl Ether 4. FEED Verification for Crude Oil and Associated System | 1. LSTK Project 2. Basic and Detailed Engineering 3. Basic and Detailed Engineering 4. FEED Level | 1. 6 months and Ongoing 2. 3 months 3. 5 months 4. 3 months |
11 | Surge Analysis | Surge analysis for Cooling water network for Glass lined exchangers ( by leased based AFT Impulse) | Special Studies | 3 months |
10 | AFT Fathom Network Hydraulic (Steady State) | Utility Network Model (Cooling Water, Brine, Chilled Water and Waste Water) using AFT Fathom | Special Studies | 3 months |
11 | Instrument datasheet Preparation | 1. Instrument Datasheet Preparation for Crude Dewaxing Unit 2. Complete Basic and Detailed Engineering of Methanol Recovery System 3. Complete Basic and Detailed Engineering of Butyl Ether 4. Detailed Engineering of Ammonia and Castor Oil System 5. FEED Verification for Crude Oil and Associated System | 1. Detailed Engineering Activity 2. Basic and Detailed Engineering 3. Basic and Detailed Engineering 4. Detailed Engineering 5. FEED Level | 1. 1 month 2. 3 months 3. 5 months 4. 6 months 5. 3 months |
12 | Line list | 1. Complete Basic and Detailed Engineering of Methanol Recovery System 2. Complete Basic and Detailed Engineering of Butyl Ether 3. FEED Verification for Crude Oil and Associated System 4. FEED Engineering for LNG and LPG System | 1. Basic and Detailed Engineering 2. Basic and Detailed Engineering 3. FEED Level 4. FEED Level | 1. 3 months 2. 5 months 3. 3 months 4. 2 months and Ongoing |
13 | Equipment list | 1. Complete Basic and Detailed Engineering of Methanol Recovery System 2. Complete Basic and Detailed Engineering of Butyl Ether 3. FEED Verification for Crude Oil and Associated System 4. FEED Engineering for LNG and LPG System | 1. Basic and Detailed Engineering 2. Basic and Detailed Engineering 3. FEED Level 4. FEED Level | 1. 3 months 2. 5 months 3. 3 months 4. 3 months and Ongoing |
14 | Hazardous Area Classification | 1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit) 2. FEED Engineering for LNG and LPG System | 1. LSTK Project 2. FEED Level | 1. 6 months and Ongoing 2. 3 months and Ongoing |
15 | Operating Manual | FEED Engineering for LNG and LPG System | FEED Level | 3 months and Ongoing |
16 | HAZOP Study and Closeout | 1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit) - Participation and Closeout of Recommmendation 2. Chairing of HAZOP Study for Bio-Gas System | 1. LSTK Project 2. Special Studies | 1. 6 months and Ongoing 2. 1 Week |
17 | SIL Study | 1. Field Gas Gathering Station (FGGS and Gas Dehydration Unit) 2. SIL Assessment (SIF Identification and Hand Switches) | 1. LSTK Project 2. Special Studies | 1. 6 months and Ongoing 2. 1 month |
18 | Safety Study 1.Emergency Isolation Valve Study 2. IPL Assessment 3. LO/LC Assessment | Multiple International Sites of our reputed client | Special Studies | 3 months to 8 months |